We do not support the proposed presumption for overhead transmission lines …. this should be a last resort solution. Alternatives arising from offshore grids and cabling solutions, onshore co-ordination, rationalisation of existing lines and a preference for novel cabling technology including HVDC and emerging superconductor technology must be considered.
Fiona Cairns, SPS Director